Route 632, Section 250 Culvert Replacement 

Screenshot 2024-07-23 121407.png

Project Overview

The Route 632 Section D250 project involves replacing the emergency pipes on Route 632 (Carbondale Road) over Ackerly Creek in Waverly Township, Lackawanna County.  The existing pipes were installed as part of an emergency repair in 2023 after the previous slab bridge collapsed during high water. The proposed project involves replacing the existing pipes with a new precast reinforced concrete box culvert. Work also includes approaching roadway reconstruction and guiding rail installation. The proposed traffic control during construction is a detour.​

 The new culvert has been designed to improve the hydraulic performance of the original culvert and maintain the existing floodplains so as not to adversely affect adjacent property owners.Roadway improvements associated with the project include full-depth pavement reconstruction in the vicinity of the culvert, new guide rail, and pavement markings that will be provided throughout the project limits. 

The purpose of the plans display is to introduce the project, display and describe the planned traffic control, and receive public input regarding questions or concerns with the project. The public is encouraged to respond to the public questionnaire and provide comments by clicking on the Public Questionnaire. If you prefer to download a printed survey form, use this (Project Questionnaire) to print a PDF questionnaire to be completed by hand and mailed to the address at the bottom of the form.​

The in-person public display meeting will take place at:  

  • Time:  6:00 PM
  • Date:  August 12, 2024​
  • Location: Waverly Township. Municipal Building, Lake Henry Dr., Eaverly, PA 18741 

The Public comment period is July 29, 2024, through August 26, 2024.


Traffic ControlScreenshot 2024-07-23 121300.png

Detour Traveling East on Route 632:

  • Continue straight on Route 407 northbound for 2.8 miles
  • Turn right onto Route 524 eastbound
  • Continue on Route 524 eastbound for 3.1 miles
  • Turn right onto I-81 southbound
  • Continue on I-81 southbound for 1.4 miles
  • Take exit 197 for Route 632

Detour Traveling West on Route 632:

  • Turn right onto I-81 northbound for 1.4 miles
  • Take exit 199 for Route 524
  • Turn left onto Route 524 westbound;
  • Continue on Route 524 westbound for 3.2 miles
  • Turn left onto Route 407 southbound
  • Continue on route 407 South for 2.8 miles
  • The detour will end at the intersection of Route 407 South and Route 632 West​