Trumbull Drive Bridge Replacement Project
Project Overview
The scope of work for the Trumbull Drive Bridge Projects consists of replacement of the existing Trumbull Drive Structure over the Wheeling and Lake Erie Railroad. Traffic control during construction will consist of half width construction, maintaining one lane of traffic controlled by a temporary signal at each end. A temporary sidewalk will also be maintained during construction. In addition to the structure, the project includes approach work, drainage improvements, sidewalk improvements, and utility relocations.