Begin Main Content Area

​Concord Road at McDonald Boulevard and ​​Sunfield Drive Intersections Improvements​​​​​​


Project Location


Overview

​The proposed project includes intersection improvements at the Concord Road/McDonald Blvd intersection and Concord Road/Sunfield Drive/WestRock driveway. The proposed project will reconfigure the two-way stop-controlled intersections into modern roundabouts. The project will involve pavement reconstruction, highway lighting, and utility relocations.

The purpose of the project is to improve mobility and meet regional and local traffic needs by reducing delays/congestion and improving safety at the intersections of Concord Road (SR 3007)/McDonald Blvd (T-405) and Concord Road (SR 3007)/Sunfield Drive (private).

The needs for this project include:
  1. Heavy traffic volumes on Concord Road create delays of over 200 seconds per vehicle in the 2045 AM & PM condition for vehicles leaving McDonald Boulevard attempting to enter Concord Road according to HCM results.  Vehicles attempting to turn left from southbound Concord Road onto Sunfield Drive create significant delays of over 130 seconds per vehicle in the AM peak hour and over 200 seconds in the PM peak hour
  2. The intersection of McDonald Boulevard and Concord Road has a crash rate that is more than twice the statewide average for similar facilities and an injury crash rate that is almost double the statewide average.