Route 492 (Jackson Street) Culvert Replacement Project
Project Overview
The Pennsylvania Department of Transportation (PennDOT) invites the public to the Jackson Township Supervisors meeting where plans will be presented regarding the Route 492 (Jackson Street), Section D50 Culvert Replacement Project over Little Bulter Creek.
The purpose of this project is to address the structural deficiency of the existing structure due to its age and condition and to provide continued safe and efficient access over Little Butler Creek.
The project consists of the replacement of the existing single-span concrete slab bridge supported on concrete abutments with a precast box culvert. The permanent approach roadway work will include tie-ins with the existing. Stream restoration work will be completed upstream and downstream of the proposed structure to address streambed stability and sediment transport issues. Additionally, guide rail upgrades and drainage improvements within the project limits will be incorporated into the project. One overhead utility line temporary relocation is expected to be necessary to construct the project.
A detour will be implemented during construction. The detour will utilize Route 547, Route 848 (Harford Road) and Interstate I-81. The detour is 15.3 miles in length and is expected to be in place for approximately two to four months. Local access to driveways will be maintained during construction.
It is anticipated that construction will begin in the summer of 2026 and will be complete by the fall of 2026.
The virtual plans display will be held online and will be available from May 10, 2024 to July 1, 2024.
The purpose of the plans display is to introduce the project, display and describe the planned detour, and receive public input regarding questions or concerns with the project. The public is encouraged to respond using the public questionnaire and provide comments by clicking on the Public Questionnaire and mail or email to the address at the bottom of the form.
The project documents can be made available in alternative languages or formats if requested. If you need translation/interpretation services or have special needs or have special concerns that require individual attention, contact Amy Lolli, PennDOT Project Manager, at (570) 614-2958 or amlolli@pa.gov.
The in-person public display meeting for both projects will take place at:
- Time: 7:00 PM
- Date: June 4, 2024
- Location: Jackson Township Building, 310 Old Mill Road, Jackson, PA 18825
Traffic Control
From points east of the bridge, head south along Route 547 for 3.6 miles towards Route 848 (Harford Road). Continue straight on Route 848 (Harford Road) west and travel 2.2 miles. Turn left onto I-81 north on ramp and travel 4.2 miles to Exit 223.
From points west of the bridge, head south along I-81 and travel 4.3 miles to Exit 219. At end of off ramp turn right onto Route 2081 and travel 0.1 miles. Turn right onto Route 848 (Harford Road) east and travel 2.3 miles towards Route 547. Continue straight on Route 547 north and travel 3.6 miles. Turn left onto Route 492. End of detour.