Bridge Replacement Project on Route 367 over Branch Tuscarora Creek
Project Overview
This project is the replacement of an existing culvert with a concrete box culvert and end sections. The project also includes full depth pavement replacement, milling and resurfacing, drainage, guide rail, and other miscellaneous construction.
Traffic Control
Traffic control will be maintained under a 8.3 mile detour.