Begin Main Content Area

​​​​​

​​Bridge Replacement Project on Route 367 over Branch Tuscarora Creek




Project Overview​

This project is the replacement of an existing culvert with a concrete box culvert and end sections. The project also includes full depth pavement replacement, milling and resurfacing, drainage, guide rail, and other miscellaneous construction. ​​

Traffic Control

​Traffic control will be maintained under a 8.3 mile detour​.