Project Overview
This is a slope failure reconstruction project along SR 2002 (Wilson Hill Road), which is located in the Delaware Water Gap Recreation Area. The proposed work includes the installation of a retaining wall, roadway reconstruction in the eastbound lane, minor roadway work in the opposite lane, guide rail, drainage, and pavement markings. A detour is proposed in order to maintain traffic flow during construction and other miscellaneous work with a total project length of 214 linear feet (0.041 miles), all as indicated on the approved drawings included in the bid package.
Detour
From Milford Road to Route 209:
- Continue north on Milford Road for 2.0 miles;
- Turn right onto Silver Lake Road;
- Continue on Silver Lake Road for 1.2 miles;
- Turn right onto Route 739 South;
- Continue on SR 739 South for 1.2 miles;
- Turn right onto Route 209 South;
- Continue on Route 209 South for .5 miles; and
- The detour will end at the intersection of Wilson Hill Road and Route 209 South.
From Route 209 North to Milford Road:
- Continue north on Route 209 for .5 miles;
- Turn left onto PA Route 739 North;
- Continue on route 739 North for 1.2 miles;
- Turn left onto Silver Lake Road;
- Continue on Silver Lake Road for 1.2 miles;
- Turn left onto Milford Road;
- Continue on Milford Road for 2.0 miles; and
- The detour will end at the intersection of Wilson Hill Road and Milford Road.