Precast Bridge Deck Panel Testing
Purpose:
The purpose of this project is to document the flexural capacity of longitudinal joints between precast
concrete deck panels and to evaluate different reinforcing details and the concrete materials for use
in these joints.
Project No:
Lafayette WO 001
Anticipated Outcomes:
The anticipated outcome of this project is to develop a simplifying revision to PennDOT’s current
typical joint detail that still satisfies flexural capacity demands, while also accommodating the region preference for bottom reinforcing bar location.
Lafayette College will evaluate / test various steel arrangements and joint materials to support their conclusions.
From this evaluation, research, and testing; conclusions and recommendations for changes to our designs, materials, publications and
standards will be developed as a series of deliverables that can later be implemented by PennDOT.
Research Contractor: Lafayette College |
Principal Investigator: Dr. David Mante |
Project Cost: $308,952.61 |