​​​Model as Legal Deliverable

The Model ​as Legal Deliverable (MALD) pilots, beginning in 2023, will put into play all aspects of the Digital Delivery Directive. The pilots will be applying new survey standards along with roadway, bridge and drainage authoring processes developed during each of the previous pilots. The project models, that are created for the MALD pilots, will be evaluated and reviewed to refine the design development and delivery processes that will ultimately become the standard for all PennDOT digital delivery projects. The deliverables for the MALD pilots will be fully developed discipline models and a project design report that will contain project data and information historically found on cover and general notes sheets.

Selected Pilot Projects:

​Project
District​​County
​SR-Section
​Description
Anticipated Let Date​
​116741
1​
Erie​
​0005-B21
​SR 5 over 6 Mile Creek
03/13/2025
​113151
2​Mifflin​2008-A02​SR 2008 over Br Jacks Creek​12/11/2025​
1127323​​Bradford
​4024-023
SR 4024 Slide Repair​11/06/2025
115573
​4
Lackawanna​​0307-IMP
SR 307 and Winola Road Safety Improvement​​04/09/2026
10867
​5
Berks​​0061-15M
PA 61 Restoration Phase 2B​
03/26/2025
​105803
​6
Montgomery
​1008-HT3
PA 63/309 Connector: Phase 3 
​12/10/2026
​117189
​8
Dauphin
​2019-022
​Nyes Rd over Beaver Creek
1/15/2026
​23590
9​Somerset​1017-01B​​Breastwork Run Br#1
01/15/2026​
​106502
10​​Clarion
0068-376​​PA 68 Dolby Street to Trout Run
09/26/2024​
117332​11
Beaver​
2004-B12​​SR 2004 Freedom Crider Rd at Lovi Rd
08/13/2026​
​73058
12​
Washington​0088-06M
​PA 88 over Peters Creek
12/10/2026​